500W Standard Multi-function Cargo Bike 500W Standard Multi-Function Cargo Bike,Front Load Cargo Bike,2 Wheels Electric Bicycle Cargo Bike,Two Wheels Cargo Bicycle Changzhou Smilo Motors Co.,Ltd , https://www.smilomotors.com
2. The working medium of the explosion-proof solenoid valve should be clean and free of particulate impurities. The dirt and the filter on the surface of the solenoid valve inner part should be cleaned regularly.
3. When the solenoid valve is faulty, in order to isolate the solenoid valve in time and ensure the normal operation of the system, it is better to install the bypass device. 4. In the pipeline system, the diameter of the solenoid valve installed on the branch road should be smaller than that of the main pipeline valve. The way to.
5, before installing the solenoid valve, the pipeline must be cleaned. It is recommended to install a filter in front of the valve and a steam trap to install the trap.
6. Do not install the valve in the low-pit area of ​​the pipe to prevent the condensation of steam, impurities, etc. in the valve and hinder the action.
7, can not be used in an explosion hazard situation.
8. In the case of insufficient pipe rigidity, it is recommended that the valve front pipe be fixed with a bracket to prevent vibration when the solenoid valve works.
9, before installation, pay attention to see the product label, read the instructions carefully to determine whether the product meets the conditions of use.
10. Pressure gauges shall be installed on the pipelines before and after the explosion-proof solenoid valve to observe the pipeline pressure.
Explosion-proof solenoid valve installation using 10 matters
1. When the solenoid valve is installed, the solenoid coils upwards and maintains the vertical position. The arrow or mark on the solenoid valve should be consistent with the flow direction of the pipeline. It must not be installed where there is splashing water or water leakage.