RR Evoque Body Kit,auto accessory,upgrade Kit,facelift Kit,conversion Kit Guangzhou YS Auto Parts Co.,LTD , https://www.zjysapcn.com
Construction period: March 2011 - March 2014 Major equipment: Excavators, bulldozers, excavators, road rollers, tamping machines, mixers, pavers, hoists, cranes, excavators, roadheaders, shield machines, Drilling rig, mud circulation reserve tank (for reference only)
Project Profile: The project is located on the south side of University Road, Xixiangtang District, Nanning, Guangxi, and the residential land area is 98,436.79 square meters, with a total construction area of ​​approximately 563,871.35 square meters. The construction of the project is mainly based on residential buildings, with clubs, commerce, farmers' markets, elementary schools and kindergartens. The project has a total design of 4,228 households and it is estimated that the total number of residents will be about 13,259. The project is planned for the North, Central and South Districts. The North District is a high-rise apartment complex consisting of four 26F apartment buildings. The Central District is a primary school and kindergarten; the Southern District is an area along the street and a high-rise residential area, with shops along the street. It consists of 12 34F high-rise residential towers and 34F high-rise residential buildings. The total project investment is unknown.
Construction Unit: Nanning Jinhao Real Estate Development Co., Ltd. Postal address: Torch Building, 1 Binhe Road, Nanning Zip Code: 530007 Contact Person: Zhong Yu Telephone Design Unit: Guangxi Transportation Research Institute (EIA)
Postal address: No. 6 Gaoxin 2nd Road, High-tech Zone, Nanning Zip code: 530001 Contact person: Mao Zhigang Telephone Fax
Hanlin Shangcheng Project
Project Name: Hanlin Shangcheng Project Area to which the project belongs: Guangxi's Progressive Stage: Start of construction (Establishment at the same time)
Related Developments: Tower Crane Infrastructure Project