What are the components of the complete computer room construction plan?

Equipment room decoration: anti-static floor laying, micro-hole ceiling and machine room wall panel decoration, ceiling and floor dust-proof treatment, fire doors and windows, etc.;
Power supply and distribution system: power supply system, power distribution system, lighting, emergency lighting, UPS power supply;
Air conditioning fresh air system: precision air conditioning in the engine room, fresh air ventilation system;
Fire alarm system: fire alarm, portable fire extinguisher;
Anti-theft alarm system: infrared alarm system;
Lightning protection grounding system: power supply lightning protection against surge protection, equipotential bonding, electrostatic discharge, grounding system;
Security system: access control, video. The company's computer room installation, big data room, network room, large, medium, small computer room, old computer room renovation, new computer room upgrade.
Computer room power environment monitoring system: computer room environmental monitoring system; computer room electrostatic floor, cloud computing center computer room, grade, rating, security, remote, protection, planning, cost, construction period, cloud computing center construction
General requirements: reasonable layout, bright color, wide field of view, with fire, moisture, dust, heat, anti-static, anti-corrosion, easy to clean, beautiful and durable performance characteristics, and light material, strong structure, not easy to deform, disassembly Convenient, easy to connect, repair, and machine room decoration under the floor and ceiling.

Car Cover

Carbon Fiber Auto Body Enhancements,Lightweight Racing Car Parts,Automotive Carbon Fiber Body Panels, Carbon Fiber Mirror Housing

Inamori Technology (Wuxi) Co., Ltd. , https://www.carbonfibrefactory.com