Decorative Aluminum Construction Profiles Decorative Aluminum Construction Profiles,Decorative Aluminum Extrusion,Aluminum Construction Wuqiang Xingdou International Trade Co., Ltd , https://www.xdaluminumproducts.com
The rapid development of the high-speed rail allows the writer to think of the current rapid development of an industry - automotive mold, the rapid development of the car in recent years, but also led to the rapid development of automotive mold.
At present, people have higher and higher requirements on the quality of automobiles: appearance, smooth lines, beautiful and beautiful; heart, skin, health, energy saving, “greenâ€, and few failures. The auto body molds, especially large and medium-sized cover molds, are an important part of the body manufacturing technology, and they are also a key link in the development of auto development capabilities. They are a prerequisite for ensuring everyone's important standards for automobiles.
China's auto mold industry has low technology content mold has been oversupply, the market profit margin is narrow, and high-tech medium and high-grade mold can not meet the needs of economic development, sophisticated and complex stamping molds, car cover molds and other high-grade mold There is still much room for development. From the perspective of the development of China's mold industry, the mold is suitable for the development of specialization and collectivization. Mold companies must take the road of integration when conditions are ripe to be an inevitable trend.
In this industry context, how to seize the opportunity to deal with the market? It depends on the company's strength, quality, and establish China's international brand, improve customer satisfaction, in order to be better.
The future of automotive mold industry
Recently, news on the Beijing-Shanghai high-speed rail accident has continued, and high-speed rail accidents have occurred frequently. Everyone has questioned the safety of high-speed rails. The Ministry of Railways has indicated that the Beijing-Shanghai high-speed railway needs 2-3 months of running-in, 2-3 months later, and a stable period. Will appear. It is hoped that the problem will be exposed as soon as possible after the break-in period of the high-speed rail, and it will be resolved as soon as possible.