Electric Switch,Electrical Switch,Touch Switch,Travel Switch Fenghua Jade Motor Co., Ltd. , http://www.chinaevatorparts.com
Â
Some US trailers have even more pronounced slopes and multiple sections. US railcars for cement, grain, and other bulk solids also are sloped.
Â
An image from Rigs of Rods of a brand new trailer shows this clearly. Note the air hose connection at the front end so the tractor can supply pressurised air, and air lines to the bottom of each section to inject pressurised air to enable the flow.Â
Specification of china shacman 48MT Cement Transportation Truck bulk powder silos truck:
Â
Vehicle model
CLW5313GFLb3
Whole vehicle main dimensions
overall dimension(LxWxH)mm
11850*2500*3980
Â
Drive system
8x4
Â
wheel base(mm)
1800+4500+1350
Weight data
curb weight(kg)
16110
Â
loading weight(kg)
19000
Â
GVW
31000
Whole vehicle main performance
Max speed(km/h)
93
Engine
Engine
WP10.300N
Â
Type
four-cylinder,in-line,water-cooling,DI,four-stroke,supercharger with intercooler, diesel engine
Â
displacement
9726ML
Â
Max power(kw/rpm)
221KW/300HP
Â
max torque(N.m/rpm)
1350/1100-1600
Gearbox
gear box
12forward,2Reseve
Rear axle
10T
 tyre size
12.00r20
Bulk system
Capacity
40m3
Â
Thickness
5mm
Â
Aircompressor
WUHU ,flow meter is 7.0m3/Min
Â
Operation
Compressor is operated by PTO ,from engine
Â
Pipe:
Â
Photo of china shacman 48MT Cement Transportation Truck bulk powder silos truck:
Company Introduction:
Â
Â
2.Our company has solid technology, flawless inspection, advanced equipment, reliable quality and flexible modes of operation. What's more, our company has roundly passed ISO9001:2000 and CCC (China Compulsory Certification) certifications. Series trucks of Cheng Li have procured remarkable achievements interiorly, especially from the investment in South Suburb Cheng Li Automobile Industry Park.
 We have been in this field for over 10 years, we have more than 300 types  of special trucks, our workers are more than 1000 and factory is more than 690,000m2 .We have successfully exported our trucks to Ghana, Sudan, Nigeria, Tajikistan, Namibia, Burma, Korea, Iran, Iraq, Vietnam etc. many Africa & Asia countries more than 4000 trucks every year.Â
3.Quality control:our company truck pass ISO,3C,BV certification.
our factory have the quality Quality Inspection Department.before sending truck for facotry ,our quality inspection department will check the truck carefully.
4.Design capacity :Our factory have 30 technician and designer.
5. Exhibition:our factory attend the Guangzhou Trade Fair each year.
6. Export market:Â Africa,Asia,South America,Pacific and so on
7.Our company cooperate with famous chasis manufacturers,such asDONGFENG,FAW,SHINOTRUK,IVECO,FOTON,SHACMAN and etc.
Company Certificate:
Shipping:
FAQ:
Q1. Quality control
A:We make quality control for each step while producing and before shipping.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
   LC terms is also can be accepted .
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.DAP etc .
Q4. How about your delivery time?
A: Generally, it will take 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
For standard products, delivery time is as below:
Water tanker truck:7 days
Fuel tanker trailer:15-20days
Garbage truck:15 days
Sweeper road truck:25 days
Wecker truck:7-10 days
Suction sewage/Fecal truck:7-15 days
Crane truck:15 days
Refrigerator/Van truck:7-15 days
Dump truck:20 days
Concrete mixer truck:7-25 days
LPG :20-30 days
LED truck:7-15 days
(the above is left hand drive chassis ,if you need the right hand drive chassis ,delivery time is longer than Left hand drive truck,Detailed clauses are subject to contract .)
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. How to control truck quality?
A: we have Rich experience workers and engineer to control quality before and on production , we strictly followed STATE special truck technical specification and safety production specification .
We have been in this line for over 15 years, dealing with all kinds of special trucks and trailers.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.
Â
Q9. Did you sell truck to our country before?
A:Our main market is Africa, Asia, South America , Oceania ,middle east , annual sales is around 5000units and keeping growing every year .
Â
china shacman 48MT Cement Transportation Truck bulk powder silos truck is Ease of flow.They empty from the bottom. Usually the flow is air assisted. By having sloped bottoms the material will tend to flow in the downslope direction and the last cement will be easier to get out.
Â
Some US trailers have even more pronounced slopes and multiple sections. US railcars for cement, grain, and other bulk solids also are sloped.
Â
An image from Rigs of Rods of a brand new trailer shows this clearly. Note the air hose connection at the front end so the tractor can supply pressurised air, and air lines to the bottom of each section to inject pressurised air to enable the flow.Â
Specification of china shacman 48MT Cement Transportation Truck bulk powder silos truck:
Â
Vehicle model
CLW5313GFLb3
Whole vehicle main dimensions
overall dimension(LxWxH)mm
11850*2500*3980
Â
Drive system
8x4
Â
wheel base(mm)
1800+4500+1350
Weight data
curb weight(kg)
16110
Â
loading weight(kg)
19000
Â
GVW
31000
Whole vehicle main performance
Max speed(km/h)
93
Engine
Engine
WP10.300N
Â
Type
four-cylinder,in-line,water-cooling,DI,four-stroke,supercharger with intercooler, diesel engine
Â
displacement
9726ML
Â
Max power(kw/rpm)
221KW/300HP
Â
max torque(N.m/rpm)
1350/1100-1600
Gearbox
gear box
12forward,2Reseve
Rear axle
10T
 tyre size
12.00r20
Bulk system
Capacity
40m3
Â
Thickness
5mm
Â
Aircompressor
WUHU ,flow meter is 7.0m3/Min
Â
Operation
Compressor is operated by PTO ,from engine
Â
Pipe:
Â
Photo of china shacman 48MT Cement Transportation Truck bulk powder silos truck:
Company Introduction:
Â
Â
2.Our company has solid technology, flawless inspection, advanced equipment, reliable quality and flexible modes of operation. What's more, our company has roundly passed ISO9001:2000 and CCC (China Compulsory Certification) certifications. Series trucks of Cheng Li have procured remarkable achievements interiorly, especially from the investment in South Suburb Cheng Li Automobile Industry Park.
 We have been in this field for over 10 years, we have more than 300 types  of special trucks, our workers are more than 1000 and factory is more than 690,000m2 .We have successfully exported our trucks to Ghana, Sudan, Nigeria, Tajikistan, Namibia, Burma, Korea, Iran, Iraq, Vietnam etc. many Africa & Asia countries more than 4000 trucks every year.Â
3.Quality control:our company truck pass ISO,3C,BV certification.
our factory have the quality Quality Inspection Department.before sending truck for facotry ,our quality inspection department will check the truck carefully.
4.Design capacity :Our factory have 30 technician and designer.
5. Exhibition:our factory attend the Guangzhou Trade Fair each year.
6. Export market:Â Africa,Asia,South America,Pacific and so on
7.Our company cooperate with famous chasis manufacturers,such asDONGFENG,FAW,SHINOTRUK,IVECO,FOTON,SHACMAN and etc.
Company Certificate:
Shipping:
FAQ:
Q1. Quality control
A:We make quality control for each step while producing and before shipping.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
   LC terms is also can be accepted .
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.DAP etc .
Q4. How about your delivery time?
A: Generally, it will take 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
For standard products, delivery time is as below:
Water tanker truck:7 days
Fuel tanker trailer:15-20days
Garbage truck:15 days
Sweeper road truck:25 days
Wecker truck:7-10 days
Suction sewage/Fecal truck:7-15 days
Crane truck:15 days
Refrigerator/Van truck:7-15 days
Dump truck:20 days
Concrete mixer truck:7-25 days
LPG :20-30 days
LED truck:7-15 days
(the above is left hand drive chassis ,if you need the right hand drive chassis ,delivery time is longer than Left hand drive truck,Detailed clauses are subject to contract .)
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. How to control truck quality?
A: we have Rich experience workers and engineer to control quality before and on production , we strictly followed STATE special truck technical specification and safety production specification .
We have been in this line for over 15 years, dealing with all kinds of special trucks and trailers.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.
Â
Q9. Did you sell truck to our country before?
A:Our main market is
China Shacman 48mt Cement Transportation Truck Bulk Powder Silos Truck
Model NO.: CLW5313GFLb3
Seats: ≤5
Horsepower: 251-350hp
Engine Capacity: >8L
Storage: Powder
Tire Certification: ECE
Tire Design: Bias
Condition: New
Thickness: 5mm
Aircompressor: 7.0m3/Min
Gear Box: 12 Speed
Discharge Height: 15m
Discharge Horizontal Distance: 5m
Max Particle Diameter: 0.1mm
Trademark: CLW
Transport Package: Nude
Specification: 40cbm
Origin: Cn
HS Code: 8705909090
Model NO.: CLW5313GFLb3
Seats: ≤5
Horsepower: 251-350hp
Engine Capacity: >8L
Storage: Powder
Tire Certification: ECE
Tire Design: Bias
Condition: New
Thickness: 5mm
Aircompressor: 7.0m3/Min
Gear Box: 12 Speed
Discharge Height: 15m
Discharge Horizontal Distance: 5m
Max Particle Diameter: 0.1mm
Trademark: CLW
Transport Package: Nude
Specification: 40cbm
Origin: Cn
HS Code: 8705909090
china shacman 48MT Cement Transportation Truck bulk powder silos truck is Ease of flow.They empty from the bottom. Usually the flow is air assisted. By having sloped bottoms the material will tend to flow in the downslope direction and the last cement will be easier to get out.